-
Heritage at Risk’ Register for built heritage
A register is being compiled listing unprotected built heritage sites that are under natural and/or human-induced threats (facing pressures from inconsiderate urbanisation, development or tourism). This is an appeal to contribute to the ‘Heritage at Risk’ Register at pdahintach@gmail.com. Kindly make us aware of such unprotected heritage buildings, mentioning the name, location, photograph and 100 words about the threatened site.